Tilt back the gantry and adjust the fork height: Pull the tilt control lever backward to tilt the gantry back to its maximum position. Next, push the lifting lever forward and lower the fork to a distance of 200-300mm from the ground. The forklift will leave and head towards the pickup location to start the next round of pickup and unloading operations.
May 07, 2024
Zanechat vzkaz
Odeslat dotaz





